Cost overruns
On-site rework and change orders push budgets 15–40% over plan — scope changes, coordination errors and extra labor draining the margin.
PEB Corp Group · Panama · Colombia · Caribbean
The group engineers (PEB Corp), manufactures at its CNC plant in Panama (NewCon Steel®, 20,000 m²/month) and builds turnkey (SmartBrix Construction).
PEB Corp is the holding company of PEB Group, providing structural engineering, BIM design and institutional and export coordination. SmartBrix Construction builds; NewCon Steel® manufactures and supplies steel.
What is PEB Group, and what does each company do? →Trusted by
Traditional construction vs. industrialized steel buildings
Traditional reinforced-concrete construction runs on structural uncertainty: budgets that get re-opened on site, schedules at the mercy of weather and material waste nobody accounts for up front. Pre-engineered steel construction resolves all three at the root.
On-site rework and change orders push budgets 15–40% over plan — scope changes, coordination errors and extra labor draining the margin.
Weather, skilled-labor shortages and site errors add months to the program — delaying occupancy, delaying revenue and delaying return.
Lost material, environmental impact and low on-site productivity — visible and hidden costs the project ends up absorbing.
» What if you could engineer that uncertainty out of the project?
Solutions — industrialized steel construction
We design in BIM, fabricate LGS/CFS profiles on CNC lines at the group's CNC plant (NewCon Steel®) at Centro Industrial PEB, Las Mañanitas, under the EMMA regime, control the shipping, and erection is carried out by SmartBrix Construction with certified crews. One team, one schedule, one accountable point of contact — for industrial, institutional, educational, hospitality and multifamily projects across Panama, Colombia and the Caribbean.
Integrated process — design, fabrication and erection
Four phases connected by data — BIM design, CNC fabrication, Caribbean logistics and on-site erection — for US developers, Caribbean GCs and institutional owners who need fixed price and schedule certainty; turnkey execution is carried out by SmartBrix Construction.
BIM modeling in Revit and Tekla, structural calculation to AISC / AISI S100-16 / ASCE 7 / NSR-10 / REP-2021, and direct fabrication data output. MEP coordination resolved before a single sheet is cut.
Automated production of Zn-Al-Mg 275 g/m² profiles to AISI S100-16 at the group's CNC plant (NewCon Steel®) at Centro Industrial PEB (Las Mañanitas), under the EMMA regime. ±0.5 mm tolerance, piece-by-piece traceability, raw-material imports free of import duties under the EMMA regime.
Consolidation, crating and optimized shipping from Panama to Colombia, the Dominican Republic and any Caribbean island in 5–10 days. Erection sequence labeled on every package.
SmartBrix Construction's certified crews execute site erection, foundation integration, envelope, MEP and finishes. Building delivered ready to operate — one handover, one warranty, one point of contact.

Conflicts are caught in software — not on site with a crane already on the clock.
Structure, mechanical, electrical and plumbing resolved in the model.
Every piece with a drawing, code and traceability record. Zero factory ambiguity.
Progress tracked against the model, not against the chaos of the site.
How a steel-framed LGS building gets built
A standard LGS/CFS project moves through six controlled steps — from foundation to finishes. Each phase has a measurable deliverable, a dedicated crew and documented verification, so architects, developers and owners can plan cash flow with precision.

Concrete cured and leveled. The exact location of wall tracks is laid out from BIM-derived shop drawings.

Vertical Zn-Al-Mg 275 g/m² C-studs are fastened to tracks with self-drilling Tek screws, checking plumb continuously.

For multi-story structures, floor and roof joists are installed and fastened to the top track of the wall panels.

Electrical wiring and plumbing pass through pre-punched knockouts in the LGS studs, protected against sharp edges.

Exterior sheathing braces the frame. Stud cavities are filled with insulation for thermal and acoustic performance.

EIFS facade, windows and metal roofing. Weather-tight, modern building, ready for operation.
Steel framing vs. traditional reinforced concrete
A typical industrial building that takes 18 months in traditional concrete is operating in ≈4 months in LGS/CFS steel framing, from fabrication order. For a developer, that's 14 extra months of revenue; for an institution, that's two school years saved or a budget not lost to late execution.
03 · Group brands
PEB Corp is the parent company of PEB Corp Group; SmartBrix Construction delivers the turnkey projects and NewCon Steel® manufactures the cold-formed steel at the group's CNC plant.

Group parent: structural engineering, BIM design, institutional relations and export gateway (Caribbean, Guyana, Suriname, DR, Venezuela).

Construction unit: turnkey Steel Framing and modular projects in Colombia, Panama and Central America.

Manufacturer of LGS/CFS cold-formed steel profiles, panels and structural kits and cold-formed bolted structural steel; does not build buildings.
Hot-rolled steel. Hot-rolled steel structures (AISC 360) are designed by PEB Corp engineering; NewCon Steel® manufactures the cold-formed bolted steel (AISI S100).
PEB Corp Group is a Panamanian industrialized steel construction group with 350+ projects and 15+ years of track record in Panama, Colombia and the Caribbean. It comprises three brands: PEB Corp (Pre-Engineered Buildings Corp, S.A.), the parent company providing structural engineering, BIM design, institutional relations and export; SmartBrix Construction (SmartBrix Centroamérica S.A.S.), the construction unit delivering turnkey Steel Framing and modular projects; and NewCon Steel® (NewCon Steel Corp.), the manufacturer of cold-formed steel (LGS/CFS) profiles, panels and structural kits at the group's CNC plant in Centro Industrial PEB, Las Mañanitas, Panama City, under the EMMA regime. The group holds ISO 9001, 14001, 45001 and 37001 certifications.
PEB Corp is the company; "PEB" (pre-engineered building) is also a generic industry term.
Delivered projects — institutional, educational, industrial, multifamily
Steel construction case studies for the Ministry of Defense, Universidad del Rosario, Saint Peter's Academy, Ecopetrol and private schools in Colombia — with real metrics on area, delivery time and typology. References directly comparable to the projects US developers, architecture firms and institutional owners are sizing up.
Government institutional building, turnkey delivery (a PEB Corp Group project executed by SmartBrix Construction), with high architectural, security and NSR-10 compliance requirements.






ISO certifications & structural standards — US, LATAM, Caribbean
We operate under four concurrent ISO management systems — quality, environment, safety and anti-bribery — audited annually by a third party. Every project is designed to the structural code of the country where it's built: AISC 360-22 and AISI S100-16 (US), ASCE 7 (wind / seismic), IBC 2021, NSR-10 (Colombia) and REP-2021 (Panama).
Technical standards
Sustainability · ESG · Sustainable steel construction
Industrialized steel construction is a more responsible alternative to traditional concrete: less waste, less water, less embodied CO₂, more traceability, and components that can be disassembled and recycled at 100%. A strong argument for investment funds with ESG targets and for government projects with sustainable-construction requirements.
100% recyclable steel. Dry construction — major water savings. Cuts calculated directly from the BIM model.
Lighter components, lower labor risk, faster erection. Less exposure at height, shorter site occupation.
Every component has a BIM record: production, QC, steel batch and fabrication date. No hidden cost overruns.
Aligned with global engineering and compliance standards. Suitable for investment, multilateral and government projects.
How to quote industrialized steel construction
A clear commercial process for US developers, Caribbean GCs, architects and institutional owners: cost certainty before committing major capital, and a fixed price (turnkey contract with SmartBrix Construction) before breaking ground. The design fee is credited against the construction contract.
We scope the project, schedule and objectives. Site, use and constraints evaluated.
Reference budget with ±20% confidence — the basis for an initial go / no-go investment decision.
Final design, detailed BIM and a precise fixed quote closed on shop drawings.
Construction & supply. The design fee is credited against the final contract.
Backing
Written backing on the integrity of the steel structure and the system's critical components.
Technical team for inquiries, preventive maintenance and post-handover support.
Every component has a BIM digital record: piece, batch, date, quality control and operator.
Contracting structures and financing options adapted to the project's cash flow.
FAQ — pre-engineered steel construction in Panama, Colombia and the Caribbean
The most common questions about steel framing, pre-engineered buildings, timelines, costs and codes across Panama, Colombia, the Dominican Republic and the wider Caribbean. If your question isn't here, email us at info@peb-americas.com — an engineer replies within 24 business hours; technical proposal / quote in 48 h.
Industrialized steel construction is a system where BIM design, engineering, CNC fabrication, logistics and erection work as a single integrated operation. LGS/CFS (Light Gauge Steel / Cold-Formed Steel) structural profiles are fabricated to millimetric tolerance at the group's CNC plant (NewCon Steel®) at Centro Industrial PEB, Las Mañanitas, under the EMMA regime and assembled on site at rates of up to 380 m² per day per crew. The result: buildings delivered 70–90% faster than traditional concrete construction, with near-zero waste, complying with NSR-10 (Colombia), REP-2021 (Panama) and AISI S100-16.
Steel framing is a construction system that replaces the concrete structure with cold-formed galvanized steel profiles (LGS/CFS). Versus traditional concrete construction, it offers: (1) builds 70–90% faster, (2) a fixed price with no cost overruns from surprises (turnkey projects executed by SmartBrix Construction), (3) self-weight up to 5 times lower — more economical foundations —, (4) better seismic performance, (5) 100% recyclable steel and (6) no curing time needed. It applies to schools, multifamily, industrial warehouses, offices and institutional buildings.
PEB Corp coordinates structural engineering, BIM and export enquiries for PEB Group. NewCon Steel manufactures and supplies cold-formed steel profiles, panels and structural kits from Panama; SmartBrix Construction delivers construction under a separate agreed scope. Contact PEB Corp for group coordination, NewCon Steel for material supply or SmartBrix for a turnkey project. The group reports 350+ delivered projects.
A typical industrial-building reference published by the group is approximately four months from the fabrication order, subject to the defined scope and site readiness. A complete project schedule must separately include engineering, permits, foundations, fabrication, shipping, erection, services and finishes. Confirm the destination and milestones in a project quotation. Larger institutional projects have different schedules: the Ministry of Defense case study reports eight months.
Steel framing can be engineered for the wind and seismic requirements of a Caribbean site. The design must consider the applicable code, local design wind speed, exposure, building use, foundations, anchors, connections and envelope. A published 250 km/h design reference is not a universal rating for every building or destination. Request project-specific calculations and confirm approval requirements with the local authority.
Yes. We serve US, Canadian and Caribbean developers building in Panama, Colombia, the Dominican Republic, Jamaica, the Bahamas, Cayman, Trinidad and Barbados. Projects are delivered turnkey by SmartBrix Construction: design, CNC fabrication at the group's CNC plant (NewCon Steel®) at Centro Industrial PEB, Las Mañanitas, under the EMMA regime, Caribbean shipping with Panamanian certificate of origin (HS 72.16) and full erection with SmartBrix Construction's certified crews. One contract, one PO, one English-speaking project manager, daily updates via email / WhatsApp / Zoom.
Compare an itemized project budget with the same building use, location, area, structural requirements and finishes. Steel prefabrication can reduce on-site work, but the financial result depends on engineering, foundations, steel supply, envelope, services, transport, erection and the programme. Request a project-specific comparison; a structural price per square metre is not a complete-building price.
The applicable design requirements depend on the project location, structural system and code edition adopted by the authority. Project references include NSR-10 in Colombia, REP-2021 in Panama, AISI standards for cold-formed steel, AISC for structural steel, and applicable ASCE/IBC criteria. Confirm the required engineering, professional signatures and approval documents for the destination; financing and insurance acceptance must be verified with the relevant institution.
We offer three delivery models: (1) full turnkey — design, fabrication, shipping and erection (SmartBrix Construction); (2) supply of LGS or cold-formed bolted structural steel fabricated by NewCon Steel® (erection by SmartBrix Construction); (3) BIM + structural design only, for architecture firms that want to subcontract the specialty. All steel leaves the group's Panama plant (NewCon Steel®) fully fabricated, kitted and sequenced for assembly.
350+ projects delivered in 15+ years: Ministry of Defense HQ in Colombia (39,000+ m²), Universidad del Rosario campus (11,500 m² in 100 days), Saint Peter's Academy, Colegio Santa Luisa, Gimnasio Fontana, Ecopetrol remote offices, POB Control Center (24/7 critical operation), industrial warehouses, logistics centers, multifamily residential, oil & gas facilities and government buildings.
Four steps: (1) discovery call to define scope, schedule and objectives; (2) technical proposal / quote in 48 h (reply within 24 business hours); (3) design contract producing detailed BIM and a fixed lump-sum quote on shop drawings; (4) construction & supply contract — the design fee is credited against the final contract. This protects capital before committing to the full build.
PEB Corp is the parent company of PEB Corp Group — structural engineering, BIM design, institutional relations and export gateway. SmartBrix Construction is the construction unit: turnkey Steel Framing and modular projects. NewCon Steel® is the manufacturer of LGS/CFS profiles, panels and kits and cold-formed bolted structural steel (AISI S100); it does not build buildings. Hot-rolled steel structures (AISC 360) are designed by PEB Corp engineering. Same engineering standard, same quality program; they differ in operational role and audience.
Excellently. Zn-Al-Mg 275 g/m² steel has a very high strength-to-weight ratio, seismic behavior superior to traditional concrete and proven wind performance up to 250 km/h (Saffir-Simpson Category 4). Every project is designed to the applicable local code — NSR-10, REP-2021, IBC — and audited by a certified structural engineer.
The quoted wind speed is a design reference, not a universal building rating. Site-specific calculations, exposure, anchorage, connections and envelope requirements must be verified for each project.
Not necessarily. The system accepts any envelope — EIFS, metal panels, brick masonry, ventilated facades, glass curtain walls. The steel structure can stay hidden or be expressed visually, depending on the architectural intent. Every project includes full coordination with the architect of record.
The published portfolio ranges from residential projects around 400 m² to large institutional buildings. Feasibility and the appropriate delivery model depend on location, use, system, design and quantities. NewCon Steel publishes plant capacity of 20,000 m² per month; actual production slots and delivery dates are confirmed for each order.
Yes — schools and educational campuses in LGS steel framing are one of our specialties. 3–4 month deliveries allow a school year to open on time. References: Saint Peter's Academy, Colegio Santa Luisa, Gimnasio Fontana and Universidad del Rosario (11,500 m² in 100 days). BIM design, optimized thermal and acoustic performance for classrooms, and compliance with NSR-10 seismic and ASCE 7 hurricane loads.
Yes. LGS/CFS steel framing supports multifamily residential up to 5–6 stories pure, and higher with hybrid LGS + bolted steel (NewCon Steel®). For US and Caribbean developers the benefit is double: accelerated cash flow — revenue up to 12 months sooner — and fixed lump-sum pricing that makes pre-sales more credible. We deliver in Panama City, Bogotá, Medellín, Santo Domingo, Kingston, Nassau and across the Caribbean.
Yes. We work under three models: (1) full turnkey via SmartBrix Construction, (2) steel structure supply (LGS or cold-formed bolted) fabricated by NewCon Steel® with erection by SmartBrix Construction, and (3) BIM + structural engineering only, for architecture firms and GCs that want to subcontract the specialty. Revit and Tekla models at LOD 400, ready for fabrication.
09 · Next step
For turnkey projects in Colombia and Panama, SmartBrix Construction will assist you; for LGS/CFS profiles, panels and kits, NewCon Steel®. For structural engineering, BIM, export to the Caribbean and institutional relations, write to us here.