BIM design & structural calculation
BIM modeling in Revit and Tekla, structural calculation to AISC / AISI S100-16 / ASCE 7 / NSR-10 / REP-2021, and direct fabrication data. MEP coordination is resolved before a single sheet is cut.
PEB Corp Group · PEB Corp · Parent · Engineering & export
PEB Corp Group · Panama · Colombia · Caribbean
PEB Corp engineers and designs. NewCon Steel® manufactures at the group’s CNC plant (20,000 m²/month, about 215,000 sq ft) and SmartBrix Construction delivers turnkey projects in Panama and Colombia. Colombia: NSR-10 structural engineering and BIM design.
At a glance
PEB Corp is the parent company of PEB Corp Group, providing structural engineering, BIM design, and institutional and export coordination. SmartBrix Construction builds; NewCon Steel® manufactures and supplies steel.
PEB Corp is the company; "PEB" (pre-engineered building) is also a generic industry term.
Conventional vs. industrialized construction
Conventional concrete construction carries more schedule and cost uncertainty: budgets reopened on site, schedules at the mercy of the weather, and waste nobody accounts for up front.
On-site rework and change orders push budgets 15–40% over plan: scope changes, coordination errors and extra labor.
Weather, skilled-labor shortages, and site errors add months to the schedule and delay occupancy.
Lost material, environmental impact, and low on-site productivity: visible and hidden costs the project ends up absorbing.

01Solutions
PEB Corp designs in BIM and engineers the structure; NewCon Steel® CNC-fabricates the LGS/CFS profiles at the group plant under the EMMA regime; the group controls logistics; and SmartBrix Construction carries out erection. One team, one schedule, and one accountable point of contact for institutional, educational, industrial, and multifamily projects.
02Integrated process
Four phases connected by data for architects, developers, and owners who need schedule certainty. Turnkey execution is carried out by SmartBrix Construction.
BIM modeling in Revit and Tekla, structural calculation to AISC / AISI S100-16 / ASCE 7 / NSR-10 / REP-2021, and direct fabrication data. MEP coordination is resolved before a single sheet is cut.

Automated production of Zn-Al-Mg 275 g/m² profiles to AISI S100-16 at the group’s CNC plant (NewCon Steel®), EMMA regime. ±0.5 mm tolerance and piece-by-piece traceability.
Consolidation, crating, and optimized shipping from Panama to Colombia, the Dominican Republic, and the Caribbean. The erection sequence is labeled on every package.
SmartBrix Construction crews carry out site erection, foundation integration, envelope, MEP, and finishes, and hand over the building ready to operate.
Why it works: digital certainty before construction starts
Conflicts are caught in software, before a crane is on site.
Structure, mechanical, electrical, and plumbing resolved in the model.
Every piece with a drawing, a code, and traceability.
Quantities and progress measured against the model, not estimated on site.
03How a steel-framed building goes up
A standard LGS/CFS project moves through six controlled steps, from foundation to finishes, each with a dedicated crew and documented verification.

On the cured, leveled concrete slab, wall-track locations are laid out from BIM shop drawings.

C-studs in Zn-Al-Mg 275 g/m² steel are fastened to tracks with self-drilling screws and checked for plumb. Floor and roof joists are then fastened to the top track of the wall panels.

Wiring and plumbing run through pre-punched knockouts in the studs, protected from sharp edges.

Exterior sheathing boards are fastened to the studs and brace the frame. The facade finish is applied over them afterward.

Stud cavities are filled with thermal and acoustic insulation, and walls and ceilings are then closed in with interior boards.

EIFS facade, windows, and metal roofing. A weather-tight building ready to operate.
04Steel framing vs. conventional concrete
As a reference published by the group, a typical industrial building can be operating in ≈4 months from the fabrication order, depending on scope and site; conventional concrete usually takes longer. For a developer, that means extra months of revenue; for an institution, a schedule it can count on.
05Group brands
PEB Corp engineers. NewCon Steel® manufactures. SmartBrix Construction builds. PEB Corp is the parent company of PEB Corp Group and provides structural engineering and BIM design; NewCon Steel® manufactures the cold-formed steel at the group’s CNC plant, and SmartBrix Construction delivers the turnkey projects.
Parent · Engineering & exportGroup parent: structural engineering, BIM design, institutional relations and the export gateway.
Construction · TurnkeyConstruction unit: turnkey Steel Framing and modular projects in Colombia, Panama and Central America.
Manufacturing · LGS/CFSManufacturer of cold-formed steel (LGS/CFS) profiles, panels and structural kits at the group’s CNC plant; it does not build buildings.
Hot-rolled steel. Hot-rolled steel structures (AISC 360) are designed by PEB Corp engineering; NewCon Steel® manufactures the bolted cold-formed steel (AISI S100).
PEB Corp Group is a Panamanian industrialized steel construction group with 350+ projects and 15+ years of track record in Panama, Colombia and the Caribbean. It comprises three brands: PEB Corp (Pre-Engineered Buildings Corp, S.A.), the parent company providing structural engineering, BIM design, institutional relations and export; SmartBrix Construction (SmartBrix Centroamérica S.A.S.), the construction unit delivering turnkey Steel Framing and modular projects; and NewCon Steel® (NewCon Steel Corp.), the manufacturer of cold-formed steel (LGS/CFS) profiles, panels and structural kits at the group's CNC plant in Centro Industrial PEB, Las Mañanitas, Panama City, under the EMMA regime. The group holds ISO 9001, 14001, 45001 and 37001 certifications.
06Group projects
PEB Corp Group projects, with published area, schedule, and building type.








A reference project’s area and delivery period describe that case; they do not guarantee another building’s schedule.
Seven projects with area, schedule, and city (SmartBrix Construction)
07Export gateway
PEB Corp coordinates engineering to each country’s code and export from the group plant. A Panamanian certificate of origin (HS 72.16) is available; import treatment is decided by the destination customs.
08Certifications and codes
PEB Corp Group operates under four ISO management systems, and every project is designed to the structural code of the country where it is built.
Quality management and traceability of every fabricated component.
Environmental management: less waste and controlled site impact.
Occupational health and safety: PPE protocol and site risk plan.
Anti-bribery management: verifiable corporate compliance.
09Sustainability · ESG
Industrialized steel construction means less waste, less water on site, and more traceability: a case for ESG-driven funds and public projects with sustainability requirements.
Up to 30% less construction waste, dry construction that saves water, and cuts calculated from the BIM model. Steel is recyclable.
Lightweight pieces, lower job-site risk, and fast erection: less work at height and less time on site.
Every component has a BIM record: production, quality control, steel coil, and fabrication date.
Processes aligned with international engineering and compliance standards, suitable for private investment, multilateral bank, and government projects.
10How to get a quote
A clear commercial process: cost certainty before you commit major capital. Reply within 24 business hours · technical proposal / quote in 48 h.
We define scope, schedule, and objectives, and assess site, use, and constraints.
A reference estimate within ±20%, the basis for the initial investment decision.
Final design, detailed BIM engineering, and a detailed quote based on shop drawings.
SmartBrix Construction quotes a fixed-scope turnkey contract. The design fee is credited against the construction contract.
Support before, during and after
Warranty terms are defined in each project contract.
A technical team for questions, preventive maintenance, and support after handover.
A BIM record of every component: piece, batch, date, and quality control.
Contracting and payment arrangements defined with each project.
11FAQ
Need more technical detail? The group blog covers costs, schedules, codes, and logistics by country.
12Quote
We reply within 24 business hours with clear next steps. If you already have drawings or bid documents, send them by WhatsApp or email and we will review them with the proposal.
Reply within 24 business hours · technical proposal / quote in 48 h
We will reply to within 24 business hours and send the technical proposal / quote in 48 h.
Your request reference:
Email us at info@peb-americas.com or WhatsApp +507 6608 8555.